At the dock stacked 5 units interconnected in stacks of 4 (total units and 46 metres in length
The 20 units will be loaded on the vessel (16.6 tons)
With use of ROV and heave compensation crane the 20 units will be lifted down to the cable on the seabed
With use of ROV will be installed on the cable on the seabed
The entire process installation process will be data logged for the clients records
The SeaCult system can be deployed by divers from a suitable vessel as depicted in the pictures.